Regulation · Object 360

Partial Withdrawals of Findings of Failure To Submit State Implementation Plan (SIP) Revisions To Amend Provisions Applying to Excess Emissions During Periods of Startup, Shutdown, and Malfunction

Partial Withdrawals of Findings of Failure To Submit State Implementation Plan (SIP) Revisions To Amend Provisions Applying to Excess Emissions During Periods of Startup, Shutdown, and Malfunction: a regulation cited by 10 reports across 1 vertical, first seen 2026-08-14.

As of 2026-08-14 · 11 links

Signals

The operational read — at a glance.

Each signal traces to the surface that produced it.

Analytics

This object's own intelligence.

Fused from the shipped analytics libs — Heat, demand, reflexivity, evidence independence, track record.

Graph footprint

Reports reached 10 Verticals 1 Provenance edges 11

First seen 2026-08-14 · primary vertical agencies-professional-services.

Trace in the explorer →

Recommended actions

What to do next.

State-derived next moves — the hooks the decision ledger wires into.

Positions

Who's staked a decision here.

Analysts and agents record a typed stance on this object — the audit trail. The aggregate is public; the full theses are Pro.

0 pursuing 0 watching 0 passing
Take a position →

No positions recorded on this object yet — be the first to stake a falsifiable claim.

What changed

What moved on this object — and around it.

A factual digest of the append-only change ledger over the last 30 days. It reports what moved — not whether it helps or hurts a thesis.

hot

30 direct changes and 926 nearby in the last 30 days — hot

Direct changes (30)

  • 2026-08-14 Partial Withdrawals of Findings of Failure To Submit State Implementation Plan (SIP) Revisions To Amend Provisions Applying to Excess Emissions During Periods of Startup, Shutdown, and Malfunction: daysUntilEffective -31 → -32
  • 2026-08-13 Partial Withdrawals of Findings of Failure To Submit State Implementation Plan (SIP) Revisions To Amend Provisions Applying to Excess Emissions During Periods of Startup, Shutdown, and Malfunction: daysUntilEffective -30 → -31
  • 2026-08-12 Partial Withdrawals of Findings of Failure To Submit State Implementation Plan (SIP) Revisions To Amend Provisions Applying to Excess Emissions During Periods of Startup, Shutdown, and Malfunction: daysUntilEffective -29 → -30
  • 2026-08-11 Partial Withdrawals of Findings of Failure To Submit State Implementation Plan (SIP) Revisions To Amend Provisions Applying to Excess Emissions During Periods of Startup, Shutdown, and Malfunction: daysUntilEffective -28 → -29
  • 2026-08-10 Partial Withdrawals of Findings of Failure To Submit State Implementation Plan (SIP) Revisions To Amend Provisions Applying to Excess Emissions During Periods of Startup, Shutdown, and Malfunction: daysUntilEffective -27 → -28

Nearby in the vertical

  • 2026-08-14 Finding of Failure To Attain the 2006 24-Hour PM2.5 Standards; California; San Joaquin Valley; Error Correction: daysUntilEffective -31 → -32
  • 2026-08-14 Air Plan Approval; New York; New York Metropolitan Area Second Ten-Year Limited Maintenance Plan for the 2006 24-Hour PM2.5 Standard: daysUntilEffective -31 → -32
  • 2026-08-14 Fee Schedules; Fee Recovery for Fiscal Year 2026: daysUntilEffective 4 → 3
  • 2026-08-14 Completed Inspection Report Disposition: daysUntilEffective -22 → -23
  • 2026-08-14 Air Plan Approval; District of Columbia; Creation of Synthetic Minor Permit Program: daysUntilEffective -17 → -18
Full ledger →

Connections

Everything this node links to.

Each link carries its provenance — declared in the data, classified by algorithm, or inferred by overlap.

Mandated by (11)

Provenance trail

Every read traces to a surface.

No un-sourced claims — the audit trail that makes this operational, not decorative.

  • Reaches 10 reports across 1 vertical in the ontology graph /explore/
  • First observed 2026-08-14 /changes/